Bulgaristan’ın Lovech şehrinde yapılması planlanan (yapımı devam eden) Atık su Arıtma Tesisinin İdari Bina, Bekçi Odası, Pompa İstasyonu, İnce Izgara Binası, Blower Odası, Çamur Susuzlaştırma Binası ile MCC Binasının ısıtma, havalandırma ve sıhhi tesisatlarının dizaynları aşağıda belirtilmiştir. Hesap raporlarının hazırlanabilmesi için Lovech şehrinin dizayn şartlarının eksiksiz olarak bildirilmesi gerekmektedir.

Título
Initial Report for Mechanic Facility Project
Traducción
Inglés

Traducido por turkuazam
Idioma de destino: Inglés

Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below.

Design requisites shall be submitted in full for the financial reports to be made ready.
Nota acerca de la traducción
Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below

Design requisites shall be submitted in full for the financial reports to be made ready
Última validación o corrección por dramati - 22 Diciembre 2007 15:16





Último mensaje

Autor
Mensaje

20 Diciembre 2007 14:55

smy
Cantidad de envíos: 2481
dramati, the translation should be the following way:
---------
Design works of the Administrative Compound, Security Office, Pump Station, Thin Riffle Compound, Blower Office, Mud Drying Compound and also MCC Compound's heating, respiration and sanitary facilities belonging to the Refinement Facility for Waste Water in Lovech City, Bulgaria, which is being planned to be built (and whose construction is ongoing) are defined below

Design requisites shall be submitted in full for the financial reports to be made ready
-------

CC: dramati

20 Diciembre 2007 16:18

sirinler
Cantidad de envíos: 134
lovech city is not mentioned in the last paragraph.

21 Diciembre 2007 09:27

smy
Cantidad de envíos: 2481
yes it is mentioned sirinler, but I think it needs to be edited one more time dramati the way follows:

...the Refinement Facility for Waste Water which is being planned to be built (and whose construction is ongoing) in Lovech City, Bulgaria,

21 Diciembre 2007 09:56

smy
Cantidad de envíos: 2481
forgot to cc, dramati please see above:

CC: dramati

21 Diciembre 2007 16:07

smy
Cantidad de envíos: 2481
dramati, could you have a look at here one more time please?

CC: dramati